New Pictures from El Porvenir CampThese are recent pictures of the new Dining Hall as of 5/3/2002 and of the recently finished bungalow. The Bungalow was built from lumber cut and milled with the sawmill at camp. All of the work was done with volunteer workers from Texas.
|
| |
|
|
|
|
| |
|
|
||
| |
|